The entire former DuPont East Chicago facility is approximately 440 acres. Find Facility Information in Envirofacts database.Archived Documents, Reports and Graphics.Current Documents, Reports and Graphics.DuPont East Chicago Facility, Western Portion/Industrial Area Statement of Basis, Administrative Record Index Site Supplement.DuPont East Chicago Facility, Western Portion/Industrial Area Statement of Basis, Administrative Record Site Index.Cleanup for Industrial Area at DuPont Fact Sheet and Announcement.TM004 Northern Baseline GWS (Groundwater Sampling (PDF).The work detailed in the CMI Work Plan and under the order will implement the corrective measures selected by EPA in the JFinal Decision and Response to Comments document. du Pont Nemours and Company and Chemours Company FC, LLC, as well as its current owner, East Chicago Gateway Partners, LLC on Novemwith the U.S. The order was signed by the former owners, E.I. The CMI Work Plan details the requirements for the design, construction and operation of corrective measures at the Former DuPont East Chicago Facility, pursuant to the RCRA § 3008(h) Administrative Order on Consent (Docket No. On AugEPA issued an approval of the Corrective Measures Implementation (CMI) Work Plan, Remedial Construction Phase I for the Former DuPont East Chicago Facility, located in East Chicago, Indiana. Remediation work and activities related to the redevelopment of the property are ongoing. Baseline groundwater sampling of the entire facility network of wells has been completed and performance monitoring began in 2021. A permeable soil cover has been added to 1,078,619 square feet, or nearly 25 acres of the northern area of the property. The excavation and off-site disposal of soils from 14 of the 20 source areas has been completed with the remaining 6 source areas planned for removal in 2022. To date over 32,897 cubic yards (CY) of metals contaminated soil has been removed from the source areas in the Northern and Southern Areas of the facility along with the in-situ stabilization (ISS) of an additional 5,404 CY of deeper saturated soils. cleanup continues at the Former DuPont East Chicago Facility. The $26.6 million comprehensive soil and groundwater groundwater Underground water. du Pont Nemours and Company, Chemours Company FC, LLC, and East Chicago Gateway Partners, LLC agreed to perform the cleanup work under a Resource Conservation and Recovery Act (RCRA) order. On November 16, 2018, EPA announced that the current and past owners agreed to a $26.6M cleanup of the facility. ![]() ![]() EPA will require DuPont, Chemours, Grace and Gateway to implement the cleanup and long-term monitoring requirements of EPA’s Final Decision. Grace and Company lease, to East Chicago Gateway Partners, LLC a property redevelopment firm. On June 29, 2018, Chemours informed EPA that it had conveyed title to the former DuPont facility and the W.R. In February 2015, the DuPont facility was transferred from DuPont to Chemours, a new wholly-owned subsidiary of DuPont, because of a corporate reorganization. The company was also required to implement interim remedial measures where necessary and submit a corrective measures study to identify and evaluate cleanup alternatives. ![]() The Order said, among other things, that DuPont must perform a RCRA Facility Investigation to determine the nature and extent of any releases of hazardous waste from the facility. In 1997, EPA issued an Administrative Order on Consent for the former DuPont East Chicago facility under EPA’s Resource Conservation and Recovery Act (RCRA) authority after an initial wide-ranging study of soil and groundwater conditions at the site was performed. Use our zip code lookup by address feature to get the full 9-digit (ZIP+4) code.The former DuPont East Chicago facility is located in East Chicago, Indiana. This list contains only 5-digit ZIP codes.
0 Comments
Leave a Reply. |